PT DATANG DSSP Power Indonesia achieved more than half of its electricity and profit in the first half of the first year


2021-07-13 10:50

As the first half of 2021 is about to pass, PT DATANG DSSP Power Indonesia achieved more than half of its electricity and profit in the first half of the first year. It generated 1.84 billion kWh of on-grid electricity, 50.4% of the annual target; made 185 million yuan in profit, 70% of the guaranteed value of the annual targeted profit.

PT DATANG DSSP Power Indonesia?adheres to the principle of “controlling risks, improving efficiency, and increasing strength”, and gives full play to the technical and management advantages of China Datang on thermal power. It?promotes the management of the joint venture in an all-round way by?following the working ideas of “stabilizing the team, enhancing mutual trust, internal and external supervision, and win-win cooperation” and the work requirements of "groundedness, operability, and quick results".

In the first half of the year, facing the severe situation of the epidemic situation in Indonesia, PT DATANG DSSP Power Indonesia?earnestly implemented various work arrangements, formulated and implemented special action plans for "improving quality and efficiency" and "three improvements, two reductions and one cure", and carried out? "six investigations and six strict" work?to remove hidden risks, making use of professional advantages to tackle shortcomings and improve capabilities.


回到頂部圖片

Copyright(C)www.china-cdto.com All Rights Reserved
Address: Floor 12, No. 1 Caishikou Street, Xicheng District, Beijing,China
PostCode:100052 Email: info@china-cdto.com

Produced By CMS 網(wǎng)站群內(nèi)容管理系統(tǒng) publishdate:2025-04-24 17:03:20